Construction of a power trestle bridge at WZK VICTORIA SA in Wałbrzych
Description of the investment:
WZK Victoria SA asked a company from the INTROL GROUP to construct the first stage of a new power trestle bridge. The investment is performed within the confines of construction of a new coke battery.
Scope of work:
• preparation of the detailed design of the new trestle bridge (including geological examinations)
• performance of earth work and construction work (piling and foundations)
• prefabrication and installation of steel structures
• prefabrication and installation of coke gas and process pipelines
• delivery and installation of power cables
• pipeline and power cables relocation work
Project type | Installation |
Period | 2012-2013 |
Total Value | N/A |
Client | Wałbrzyskie Zakłady Koksownicze VICTORIA SA |