Modernization at PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI Sp. z o.o. in Starachowice
Description of the investment:
The city of Starachowice takes its water from local deep wells. Introl modernized the Starachowice Water Intake Plant with a total capacity of 1000m3/hour according to the latest standard of intake water supply. The implemented solution is an advanced control system based on fiber optical signal transmission, remote GPRS transmissions, DCS and SCADA visualization.
Scope of work:
• consulting and conceptual design
• design of mechanical intake water system
• design of filtering system
• design of electrical and control system
• water analizing system
• installation of medium voltage switch gear
• complete electrical installation
• fiber optical transmission network
• DCS and SCADA control system
Project type | Installation |
Period | 2008-2010 |
Total Value | N/A |
Client | Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. w Starachowicach |