Modernization of OP-230 boiler automation system – boiler control software at ECII BYDGOSZCZ
Description of the investment:
The Bydgoszcz II thermal-electric power station is the main supplier of heat and electrical energy for the city. The Bydgoszcz II facility uses a OP-230 boiler, which is a steam, pulverized-fuel boiler with natural water circulation and one boiler drum; it is a radiant-type boiler, with a three-stage steam superheater, water heater and two rotating air heaters.
Objectives:
• ensuring continuous and safe steam boiler operation
• increasing boiler efficiency
Scope of work:
• preparing the concept of automation, control, adjustment, measurement, electrics and visualization,
• programming, implementation of the new boiler and SCADA
• factory acceptance tests
• start- up of the control and measurement instruments and automation circuits system
• optimization of the automatic adjustment system
• training the personnel in equipment operation
Project type | Installation |
Period | 2010-2012 |
Total Value | N/A |
Client | PGE GiEK SA |