Description of the investment:

WZK Victoria SA asked a company from the INTROL GROUP to construct the first stage of a new power trestle bridge. The investment is performed within the confines of construction of a new coke battery.


Scope of work:

• preparation of the detailed design of the new trestle bridge (including geological examinations)
• performance of earth work and construction work (piling and foundations)
• prefabrication and installation of steel structures
• prefabrication and installation of coke gas and process pipelines
• delivery and installation of power cables
• pipeline and power cables relocation work

Project type Installation
Period 2012-2013
Total Value N/A
Client Wałbrzyskie Zakłady Koksownicze VICTORIA SA