Description of the investment:

The Bydgoszcz II thermal-electric power station is the main supplier of heat and electrical energy for the city. The Bydgoszcz II facility uses a OP-230 boiler, which is a steam, pulverized-fuel boiler with natural water circulation and one boiler drum; it is a radiant-type boiler, with a three-stage steam superheater, water heater and two rotating air heaters.

Objectives:
• ensuring continuous and safe steam boiler operation
• increasing boiler efficiency

Scope of work:

• preparing the concept of automation, control, adjustment, measurement, electrics and visualization,
• programming, implementation of the new boiler and SCADA
• factory acceptance tests
• start- up of the control and measurement instruments and automation circuits system
• optimization of the automatic adjustment system
• training the personnel in equipment operation

Project type Installation
Period 2010-2012
Total Value N/A
Client PGE GiEK SA